Mayor Garth Harris Two Year Town Review 3 “Infrastructure Management”


Mayor Garth Harris Two Year Town Review “Infrastructure Management”

”Preeceville has seen a strong housing sale over the past number of years with new homes starts higher than the past 25 years.  Plans for new residential and commercial lots are ongoing and will be brought on line as needed.  With up to 40 residential lots needed over the next ten years we are currently doing a number of utility studies to meet our current capacity and future needs as well.  We are hoping for matching Provincial and Federal dollars under the Building Canada Program for a Water Utility Project of $1.5 million with a full review on our waste water system which may run up to an additional $3 million to update over the next ten years.  Our Community Plan will continue to look into the future for all our services for the town. Half way through our 4 year mandate we on track with most projects in our five-year capital plan which we have started to set in December each year in order to have staff ready for the New Year. The formal budget will still be set in May of each year.  Council’s work over the last two years will be to ensure we have all our policies and procedures up-to-date and that staff has the training and tools to do their jobs and ensure safe operations of our town.”  

MAYOR’S DRAFT BUSINESS PLAN 2013 - 2017

The Town of Preeceville will plan and provide for the continued development and maintenance of quality infrastructure and facilities in accordance with the needs of the community.

3.            Infrastructure Management

The Town has a substantial investment in existing assets, such as buildings, parks, roads, underground infrastructure, and equipment.  These assets meet the current needs; however, the Town must plan and develop facilities and infrastructure for a growing, thriving community.  The economic life of the Town’s assets will be enhanced through proper ongoing maintenance. The Town is a responsible steward of the community’s natural resources.

Provide Appropriate Facilities Action:

• Plan and provide for the continued development and maintenance of quality facilities in accordance with the needs of the community. (Report to date: Review is ongoing with needs added into our 5 year Capital plan)

• Proceed with revitalizing the Recreation Centre and Legion Hall, recognized as the hub of activities in the community, through renovations and upgrading. (Report to date: Both the Rec Centre and the Legion have/or being renovated and both are well used. 75% done)

• Upgrading safety glass in the Public Viewing area of the skating arena.  (Report to date: 100% done)

• Start off a three year paving program. Seventh Street NE, Third Ave NE (Report to date: Capital funding started)

• Extension of 1st Ave South East to provide for more available lots in the industrial area. (Report to date: As needed)

• Continuation of the replacement and new installation of sidewalks. Crosswalk at 1st Ave NE (Report to date: All old system has been replaced and new installation underway from downtown up to the North end of town started)

•             Residential water meter replacement program (convert existing to remote read). (Report to date: Meter reading gun bought along with 50 meter which are replacing worn out homes. 7% done)

• Optimize street lighting through upgrades to meet recommended levels. (Report to date: No formal review done)

• Sewer main relining, replacement program. ( Report to date: Study ongoing, Capital funding to start)

•Fire hydrant assessment, replacement program. (Report to date: Assessment ongoing with planned replace of three pre year. 5 done, one remains. Capital funding started. )

•             Develop Geographical Information System to ensure all infrastructure is precisely recorded and information is available. (Report to date: Asset study underway)  