Snow Removal
”Priority One will be emergency routes and our main arterial roads namely access to the hospital, care homes and school. These streets and Main Street down town are cleared before the start of morning traffic. Next come streets with low traffic and sidewalks based on that snowfall’s challenges relating to staffing and equipment drivers. Our primary responsibility is to keep roads passable so that vehicles can drive with safety. The next morning the remaining streets are divided into different priorities again on the basis of traffic volumes, grade of hills, parking around the school, access to businesses, and then low-volume streets. By the end of the third day after an average snowfall all streets and alleys should be clear. Alleys may have a secondary safety priority for garage pickup staff Monday mornings. After a snowfall help us clean efficiently and fast by not parking on the street until it is done. Roads and sidewalks that are very icy should be reported to the Town online or by calling 306-547-2810.” Mayor Harris
Things that matter in small town Saskatchewan “To provide a welcoming, healthy, and safe community”
Thursday, 12 February 2015
Monday, 9 February 2015
A symbol of Canadian identity
"A symbol of Canadian identity"
"The official ceremony inaugurating the new Canadian flag was held on Parliament Hill in Ottawa on February 15, 1965, with Governor General Georges Vanier, Prime Minister Lester B. Pearson, the members of the Cabinet and thousands of Canadians in attendance"
Our Flag is turning 50 in 2015.
Take a picture or video of you and the flag. You can also use an existing one.
Share it on social media with the hashtag #flag50
Challenge your family and friends to do the same.
Happy 50th Birthday from frosty Preeceville, Saskatchewan.
Our flag is a “A symbol of Canadian identity"
This Sunday February 15th, what are you doing to celebrate?
Whatever you’re doing, include our flag.
The Preeceville Challenge is to video or take a photo with our flag
Share on social media with the hashtag #flag50
then pass on the challenge.
I do have a limited supply of buttons to hand out. Include these
in your photo's if you like. Check out the facebook page
Take the Flag - https://m.facebook.com/profile.php?id=1550265501895586
where you can also post your Preeceville & Area photo's throughout the year.
"Show your Canadian Pride"
Saturday, 7 February 2015
Moving Forward - Official Community Plan - Plan
Moving Forward - Official
Community Plan
Introduction
·
Purpose of the Plan
·
Scope of the Plan
Values
·
Town in context with the region
·
Past Strategic plans
Overview
·
Growth to date
·
Town assets
·
Developments started
Land Use
·
Land Map
·
Supply Map
Residential Land Use
Policies
·
Design and Development
·
Infill Housing Policy
·
Housing Supply
·
Home Businesses
Commercial Land Use
Policies
·
Downtown
·
Business Park
·
Light Industrial
·
Heavy Industrial
·
Regional Development
·
General Policies
Environmental
Management
·
Parks and Recreation Spaces
·
Conservation of Natural Areas
·
River and Lake Stewardship
·
Urban Forestry
·
Source Water Protection
·
Wetlands
Community Services
·
Community Facilities
·
Education Facilities
·
Transportation
·
Street Classification
Public Utilities
·
Development Costs
·
Design
·
Studies
Heritage
·
Museum
·
Buildings
·
History
Implementation
·
Plan Bylaw
·
Zoning Bylaw
·
Coordination with Region
·
Public Consultation
·
Definitions
·
Plan Evaluation
·
Amendments
Friday, 6 February 2015
Mayor Garth Harris Two Year Town Review 6 “Corporate Communications”
Mayor Garth Harris Two Year Town Review 6 “Corporate
Communications”
”Preeceville has seen a strong housing sale over the past
number of years with new homes starts higher than the past 25 years. Plans for new residential and commercial lots
are ongoing and will be brought on line as needed. With up to 40 residential lots needed over
the next ten years we are currently doing a number of utility studies to meet
our current capacity and future needs as well.
We are hoping for matching Provincial and Federal dollars under the
Building Canada Program for a Water Utility Project of $1.5 million with a full
review on our waste water system which may run up to an additional $3 million to
update over the next ten years. Our
Community Plan will continue to look into the future for all our services for
the town. Half way through our 4 year mandate we on track with most projects in
our five-year capital plan which we have started to set in December each year
in order to have staff ready for the New Year. The formal budget will still be
set in May of each year. Council’s work
over the last two years will be to ensure we have all our policies and
procedures up-to-date and that staff has the training and tools to do their
jobs and ensure safe operations of our town.”
MAYOR’S DRAFT BUSINESS PLAN 2013 - 2017
“The Town of Preeceville will promote effective
communication both inside and outside the organization”
6. Corporate
Communications
The Town of Preeceville recognizes the importance of
effective communications in the delivery of our services to the community. Communication is a two way process and we
will maintain and encourage regular dialogue with residents, stakeholders and
partners so that information and ideas are exchanged both inside and outside
the organization.
• Communicate in a consistent, relevant and frequent way
with the aim of reaching those most affected in the best way possible. (Report to date: Plan is working. Ongoing review should be done by F2015 year
end. 40% done)
• Regularly consult with residents, partners, businesses and
visitors so they can influence the quality and nature of services available to
them. (Report to date: Ongoing review
should be done by F2015 year end. 40% done)
• Ensure that local people can contact us in new ways by
making use of the latest technology. We will widen people’s choices of
communication, being careful not to take away what many are comfortable with
and want. (Report to date: Ongoing
review should be done by F2015 year end. 40% done)
• Monitor the website on a regular basis to ensure the
information is in plain English, up to date, relevant and correct. (Report
to date: Monitoring is done weekly and a refit for the website is under review
should be done by mid F2016. 20% done)
• Communication Strategy Guidelines will be used in the
design and development of all Town publications. (Report
to date: Current strategy is 6 years old and is under review should be done by
mid F2016. 50% done)
• Supporting and marketing our key tourist attractions
through funding as well as promotion and marketing partnerships. (Report to date: On track with a review being
done by F2015 year end. 90% done)
• Marketing of the community and its assets through highway
billboards. (Report to date: On track
with a review being done by F2015 year end. 90% done)
• Marketing Strategy Guidelines will be used to market the community.
(Report to date: On track with a
review being done by F2015 year end. See EDC Strategy. 90% done)
Mayor Garth Harris Two Year Town Review 5 “Community Economic Development”
Mayor Garth Harris Two Year Town Review 5 “Community Economic
Development”
”Preeceville has seen a strong housing sale over the past
number of years with new homes starts higher than the past 25 years. Plans for new residential and commercial lots
are ongoing and will be brought on line as needed. With up to 40 residential lots needed over
the next ten years we are currently doing a number of utility studies to meet
our current capacity and future needs as well.
We are hoping for matching Provincial and Federal dollars under the
Building Canada Program for a Water Utility Project of $1.5 million with a full
review on our waste water system which may run up to an additional $3 million to
update over the next ten years. Our
Community Plan will continue to look into the future for all our services for
the town. Half way through our 4 year mandate we on track with most projects in
our five-year capital plan which we have started to set in December each year
in order to have staff ready for the New Year. The formal budget will still be
set in May of each year. Council’s work
over the last two years will be to ensure we have all our policies and
procedures up-to-date and that staff has the training and tools to do their
jobs and ensure safe operations of our town.”
MAYOR’S DRAFT BUSINESS PLAN 2013 - 2017
”The Town of Preeceville will actively encourage planned
economic development and revitalization through cooperative partnerships and
effective promotion”
5. Community
Economic Development
Efforts will be undertaken to promote the Town and the area.
In addition to retaining existing businesses, an emphasis will be placed on
attracting the right type of commercial or industrial business to help support
our tax base. These endeavors will support the mission of the Preeceville
Community Development Corporation, which is to create an environment where
people want to live and are encouraged and afforded the opportunity to prosper
and grow.
Assiniboine Industrial Park Area Action: (Report to date: All improvements stopped
until lots are needed. 15% done)
• Extend water and sewer lines.
• Actively promote the Industrial area.
• Encourage & support expansion of existing businesses
in industrial park. Promote Commercial
Property & Opportunities Action:
• Use Town of Preeceville website to advertise and promote
vacant industrial and commercial land and vacant industrial buildings when
appropriate.
• Facilitate the development of potential commercial
property through the purchase and resale of property where merited.
• Participate in Provincial attraction initiatives.
Mayor Garth Harris Two Year Town Review 4 “Organizational Excellence”
Mayor Garth Harris Two Year Town Review “Organizational
Excellence”
”Preeceville has seen a strong housing sale over the past
number of years with new homes starts higher than the past 25 years. Plans for new residential and commercial lots
are ongoing and will be brought on line as needed. With up to 40 residential lots needed over
the next ten years we are currently doing a number of utility studies to meet
our current capacity and future needs as well.
We are hoping for matching Provincial and Federal dollars under the
Building Canada Program for a Water Utility Project of $1.5 million with a full
review on our waste water system which may run up to an additional $3 million to
update over the next ten years. Our
Community Plan will continue to look into the future for all our services for
the town. Half way through our 4 year mandate we on track with most projects in
our five-year capital plan which we have started to set in December each year
in order to have staff ready for the New Year. The formal budget will still be
set in May of each year. Council’s work
over the last two years will be to ensure we have all our policies and
procedures up-to-date and that staff has the training and tools to do their
jobs and ensure safe operations of our town.”
MAYOR’S DRAFT BUSINESS PLAN 2013 - 2017
4. Organizational Excellence
Leadership should continuously improve the delivery of
effective and efficient service to our citizens. We will encourage staff and
volunteers with the Town’s vision; and foster the ability to work with and for
the good of the overall community. Staff and volunteers must have the tools
needed to do the job.
Provide Responsible Leadership:
• Provide responsible leadership
and government for the community. (Report
to date: Both Council and staff attend meetings and courses throughout the year
each designed to improve skills needed. 75% done )
• Maintain tax rates including property and other taxes and
user fees, which are competitive with other communities in the North East
Saskatchewan Region. (Report to date:
Sharing of information and networking with other communities is ongoing. We
even share some equipment costs through a joint association membership.
)
• Maximize public resources through competition, privatization
and optimization. (Report to date: Some work has been review, none that can be reported.)
• Strengthen work-life environment where employees are
motivated, productive and fairly compensated in order to retain and attract
qualified personnel. (Report to date:
A wage review has been done and put in place, training is a large part of employee
reviews each year. Work Safe programs are in place. 80% done)
• Use information technology to enhance information
gathering and analysis in order to improve processes and service delivery. (Report to date: Review is ongoing)
• Serve a growing population while
maintaining administrative costs at current or near current levels. (Report to date: Much work has been done
around our staffing needs for today and the years ahead. The plan put in place
in 2013 has been met with trained employees that meet the needs of our town
mandate. 75% done )
Thursday, 5 February 2015
Mayor Garth Harris Two Year Town Review 3 “Infrastructure Management”
Mayor Garth Harris Two Year Town Review “Infrastructure
Management”
”Preeceville has seen a strong housing sale over the past
number of years with new homes starts higher than the past 25 years. Plans for new residential and commercial lots
are ongoing and will be brought on line as needed. With up to 40 residential lots needed over
the next ten years we are currently doing a number of utility studies to meet
our current capacity and future needs as well. We are hoping for matching Provincial and
Federal dollars under the Building Canada Program for a Water Utility Project
of $1.5 million with a full review on our waste water system which may run up
to an additional $3 million to update over the next ten years. Our Community Plan will continue to look into
the future for all our services for the town. Half way through our 4 year
mandate we on track with most projects in our five-year capital plan which we
have started to set in December
each year in order to have staff ready for the New Year. The formal budget will still be set in May of each year. Council’s work over the last two years will
be to ensure we have all our policies and procedures up-to-date and that staff
has the training and tools to do their jobs and ensure safe operations of our
town.”
MAYOR’S DRAFT BUSINESS PLAN 2013 - 2017
The Town of Preeceville will plan and provide for the
continued development and maintenance of quality infrastructure and facilities
in accordance with the needs of the community.
3. Infrastructure Management
The Town has a substantial investment in existing assets,
such as buildings, parks, roads, underground infrastructure, and
equipment. These assets meet the current
needs; however, the Town must plan and develop facilities and infrastructure
for a growing, thriving community. The
economic life of the Town’s assets will be enhanced through proper ongoing
maintenance. The Town is a responsible steward of the community’s natural
resources.
Provide Appropriate Facilities Action:
• Plan and provide for the continued development and
maintenance of quality facilities in accordance with the needs of the
community. (Report to date: Review is
ongoing with needs added into our 5 year Capital plan)
• Proceed with revitalizing the Recreation Centre and Legion
Hall, recognized as the hub of activities in the community, through renovations
and upgrading. (Report to date: Both
the Rec Centre and the Legion have/or being renovated and both are well used.
75% done)
• Upgrading safety glass in the Public Viewing area of the
skating arena. (Report to date: 100% done)
• Start off a three year paving program. Seventh Street NE,
Third Ave NE (Report to date: Capital
funding started)
• Extension of 1st Ave South East to provide for more
available lots in the industrial area. (Report
to date: As needed)
• Continuation of the replacement and new installation of sidewalks.
Crosswalk at 1st Ave NE (Report to
date: All old system has been replaced and new installation underway from
downtown up to the North end of town started)
• Residential
water meter replacement program (convert existing to remote read). (Report to date: Meter reading gun bought
along with 50 meter which are replacing worn out homes. 7% done)
• Optimize street lighting through upgrades to meet
recommended levels. (Report to date:
No formal review done)
• Sewer main relining, replacement program. ( Report to date: Study ongoing, Capital
funding to start)
•Fire hydrant assessment, replacement program. (Report to date: Assessment ongoing with
planned replace of three pre year. 5 done, one remains. Capital funding started.
)
• Develop
Geographical Information System to ensure all infrastructure is precisely
recorded and information is available. (Report
to date: Asset study underway)
Subscribe to:
Posts (Atom)
